North San Bernardino Business Park

information

Client: Hillwood Investments
Location: San Bernardino, CA
Year completed: 2008
Scope of Services: Boundary Survey, Topographic Survey, Aerial Survey, Parcel Map, ALTA Survey, Surface Water Management, SWPPP, Sewer Design, Storm Drain Design, Sewer Area Study, Cost Estimates, Construction Staking

description

A 6 building, 210-acre distribution warehouse project with over 1.5 million square feet of quality distribution space, located east of the Cajon Creek. Project included surveying, grading plan, street improvement plan and the design of 11,000 lineal feet of County of San Bernardino Master Storm Drain in Cajon Boulevard with a 750 lineal foot groin at outlet into Cajon Creek. A LOMR was processed with FEMA to remove a portion of the project site from an existing flood plain. A 1,200 lineal feet storm drain system was installed in BNSF Railroad right of way to protect an existing bridge structure. A series of onsite detention basins was designed to control 100 year flows as well as provide water quality treatment.



Return To Projects